Mooring Details: from 2023-09-21 19:52:00 to 0000-00-00 00:00:00
Time Event: 2023-09-21 19:52:00, Deployed by M/V James Goodwin
Sensor Performance: From 2023-09-21 19:52:00 to 0000-00-00 00:00:00
Data_type: conductivity and Depth: 20 m Data_type: temperature and Depth: 20 m
Deployed on Mooring: N0121
Mooring Details: from 2018-07-08 16:15:00 to 2019-09-21 14:00:00
Time Event: 2018-07-08 16:15:00, deployed (slack mooring) by R/V Connecticut Time Event: 2018-12-11 22:00:00, Buoy broke free from its anchor - presently adrift. Time Event: 2019-09-21 14:00:00, Recovered by Portugese Naval vessel off Ponta Delgado (Azores). Wire rope had been parted below 50m IM (bottom 3 IMs were lost).
Sensor Performance: From 2018-07-08 16:15:00 to 2019-09-21 14:00:00
Data_type: conductivity and Depth: 50 m Data_type: temperature and Depth: 50 m
Deployed on Mooring: M0125
Mooring Details: from 2015-11-05 04:05:00 to 2016-10-08 11:50:00
Time Event: 2015-11-05 23:05:00, Redeployed (turnaround) by the R/V Connecticut Time Event: 2016-10-08 11:50:00, Recovered by R/V PISCES
Sensor Performance: From 2015-11-05 23:05:00 to 0000-00-00 00:00:00
Data_type: conductivity and Depth: 100 m Data_type: temperature and Depth: 100 m
Deployed on Mooring: M0123
Mooring Details: from 2014-05-31 14:10:00 to 2014-09-18 16:10:00
Time Event: 2014-05-31 14:10:00, Redeployed by R/V Connecticut. Time Event: 2014-09-18 16:10:00, Recovered by R/V Connecticut.
Sensor Performance: From 2014-05-31 14:10:00 to 0000-00-00 00:00:00
Data_type: temperature and Depth: 100 m Data_type: conductivity and Depth: 100 m
Deployed on Mooring: M0122
Mooring Details: from 2013-06-23 16:34:00 to 2014-05-31 11:00:00
Time Event: 2013-06-23 16:34:00, Redeployed by R/V Connecticut. Time Event: 2014-03-21 12:25:00, Last backup Goes transmission received from buoy. Since the primary Iridium system failed in Jan 2014, no data are presently being received from this site. Time Event: 2014-05-06 16:15:00, Vist to buoy M01 by R/V Osprey. Considerable water found in well; battery failed. Removed control box; installed trackpack. Air, visibility and RMYoung had been damaged. Time Event: 2014-05-31 11:30:00, Recovered by R/V Connecticut.
Sensor Performance: From 2013-06-23 16:34:00 to 0000-00-00 00:00:00
Data_type: conductivity and Depth: 100 m Data_type: temperature and Depth: 100 m
Deployed on Mooring: E0129
Mooring Details: from 2012-04-15 01:35:00 to 2013-06-24 10:45:00
Time Event: 2012-04-15 01:35:00, Redeployed by R/V Delaware II Time Event: 2013-06-24 10:45:00, Recovered by R/ V Connecticut
Sensor Performance: From 2012-04-15 01:35:00 to 0000-00-00 00:00:00
Data_type: conductivity and Depth: 20 m Data_type: temperature and Depth: 20 m
Deployed on Mooring: E0202
Mooring Details: from 2010-08-11 14:30:00 to 2011-01-06 17:30:00
Time Event: 2010-08-11 14:30:00, New control box, waves sensors installed by F/V Priscilla Earl. Time Event: 2010-11-08 05:00:00, Buoy batteries are too low; buoy in low-power mode (daily transmissions, hourly met samples) Time Event: 2010-11-18 10:50:00, Battery has recharged and buoy has resumed normal communications/sampling. Time Event: 2011-01-06 17:30:00, Recovered by R/V Argo Maine.
Sensor Performance: From 2010-08-11 14:30:00 to 0000-00-00 00:00:00
Data_type: conductivity and Depth: 20 m Data_type: temperature and Depth: 20 m
Deployed on Mooring: E0201
Mooring Details: from 2010-06-22 17:59:00 to 2010-08-11 13:10:00
Time Event: 2010-06-22 17:59:00, Deployed by R/V Argo Maine. Time Event: 2010-08-11 13:10:00, Control box swap. New buoy will be E0202.
Sensor Performance: From 2010-06-22 17:59:00 to 0000-00-00 00:00:00
Data_type: conductivity and Depth: 20 m Data_type: temperature and Depth: 20 m
Deployed on Mooring: M0115
Mooring Details: from 2009-03-26 13:35:00 to 2009-10-02 14:25:00
Time Event: 2009-03-26 13:35:00, redeployed by R/V Delaware II Time Event: 2009-03-26 13:35:00, redeployed by R/V Delaware II Time Event: 2009-10-02 14:25:00, Recovered by R/V Argo Maine.
Sensor Performance: From 2009-03-26 13:35:00 to 0000-00-00 00:00:00
Data_type: conductivity and Depth: 20 m Data_type: temperature and Depth: 20 m
Deployed on Mooring: D0201
Mooring Details: from 2006-12-14 20:10:00 to 2008-05-01 14:35:00
Time Event: 2006-12-14 20:10:00, Deployed by R/V Argo Maine Time Event: 2007-01-29 00:00:00, Battery dropping - icing problems? Time Event: 2007-02-01 18:00:00, Set buoy to call in once per day instead of hourly due to dropping battery voltage. Time Event: 2007-02-09 15:00:00, Battery has dropped too lower to power data logger. No coms with the buoy at this time. Time Event: 2007-02-20 16:00:00, Bowdoin personnel cleared solar panels of heavy icing. Time Event: 2007-02-23 19:30:00, Buoy has started daily phone calls once again. Once battery is sufficiently recharged, hourly calls will resume. Time Event: 2007-03-24 15:00:00, Battery has recharged and buoy has resumed normal communications and sampling. Time Event: 2008-05-01 14:35:00, Recovered by R/V Ira C.
Sensor Performance: From 2006-12-14 20:10:00 to 0000-00-00 00:00:00
Data_type: conductivity and Depth: 10 m Data_type: temperature and Depth: 10 m
Deployed on Mooring: B0111
Mooring Details: from 2006-04-10 13:35:00 to 2006-09-13 11:30:00
Time Event: 2006-04-10 13:40:00, redeployed by NOAA Ship Delaware II Time Event: 2006-09-13 11:30:00, Recovered by R/V Argo Maine. Time Event: 2006-09-13 14:34:00, Redeployed by R/V Argo Maine. Time Event: 2006-09-13 11:30:00, Recovered by R/V Argo Maine
Sensor Performance: From 2006-04-10 13:40:00 to 2006-09-13 11:30:00
Data_type: conductivity and Depth: 20 m Data_type: temperature and Depth: 20 m
Deployed on Mooring: B0110
Mooring Details: from 2005-10-22 18:45:00 to 2006-04-09 23:40:00
Time Event: 2005-10-22 18:45:00, Redeployed by R/V Argo Maine. Time Event: 2006-04-09 23:40:00, recovered by NOAA Ship Delaware II
Sensor Performance: From 2005-10-22 18:45:00 to 2006-04-09 23:40:00
Data_type: temperature and Depth: 20 m Data_type: conductivity and Depth: 20 m
Deployed on Mooring: B0108
Mooring Details: from 2005-01-06 18:35:00 to 2005-04-28 21:30:00
Time Event: 2005-01-06 19:35:00, Mooring redeployed by R/V Argo Maine Time Event: 2005-04-28 21:30:00, Recovered by RV Delaware
Sensor Performance: From 2005-01-06 19:35:00 to 2005-04-28 21:30:00
Data_type: conductivity and Depth: 20 m Data_type: temperature and Depth: 20 m
Deployed on Mooring: B0107
Mooring Details: from 2004-10-07 21:10:00 to 2005-01-06 12:10:00
Time Event: 2004-10-07 21:10:00, Mooring redeployed by R/V Argo Maine. Time Event: 2005-01-06 12:10:00, Recoverd by R/V Argo Maine
Sensor Performance: From 2004-10-07 21:10:00 to 2005-01-06 12:10:00
Data_type: conductivity and Depth: 20 m Data_type: temperature and Depth: 20 m
Deployed on Mooring: M0103
Mooring Details: from 2003-07-09 04:27:00 to 2003-10-07 16:50:00
Time Event: 2003-07-09 03:00:00, Redeployed by R/V Argo Maine
Sensor Performance: From 2003-07-09 03:00:00 to 2003-10-07 17:29:00
Data_type: conductivity and Depth: 100 m Data_type: temperature and Depth: 100 m
Non-Deployment Sensor Events:
Time Event: 2021-01-22 00:00:00, Event: Post-Recovery
Comments: Data file downloaded
Time Event: 2016-10-22 00:00:00, Event: Post-Recovery
Comments: Data file downloaded
Time Event: 2014-10-07 00:00:00, Event: Post-Recovery
Comments: Data file downloaded
Time Event: 2013-06-05 18:51:00, Event: Prepared
Comments: Ready for deployment
Time Event: 2013-04-24 15:30:00, Event: In_from_Repair
Comments: New IM end caps (old one had low inductance)
Time Event: 2013-01-25 00:00:00, Event: Out_for_Repair
Comments:
Time Event: 2013-01-24 00:00:00, Event: Out_for_Repair
Comments:
Time Event: 2012-12-17 00:00:00, Event: Post-Recovery
Comments: Data file downloaded
Time Event: 2012-03-23 00:00:00, Event: Prepared
Comments: Ready for deployment
Time Event: 2011-01-10 00:00:00, Event: Post-Recovery
Comments: Data file downloaded
Time Event: 2010-06-14 00:00:00, Event: Prepared
Comments: Ready for deployment
Time Event: 2009-10-19 00:00:00, Event: Post-Recovery
Comments: Data file downloaded
Time Event: 2006-11-27 00:00:00, Event: Prepared
Comments: Ready for deployment
Time Event: 2005-10-18 00:00:00, Event: Post-Recovery
Comments: Data file downloaded
Time Event: 2005-09-07 00:00:00, Event: Prepared
Comments: Ready for deployment
Time Event: 2005-08-19 00:00:00, Event: In_from_Repair
Comments: Calibrated
Time Event: 2005-07-05 00:00:00, Event: Out_for_Repair
Comments: Sent for Calibrations
Time Event: 2005-06-01 00:00:00, Event: Post-Recovery
Comments: Data file downloaded
Time Event: 2004-08-19 00:00:00, Event: Prepared
Comments: Ready for deployment
Time Event: 2004-07-30 00:00:00, Event: Refurbished
Comments: Batteries tested, Poison Cells, Physical Checkout, Ready to Program
Time Event: 2003-11-03 00:00:00, Event: Post-Recovery