Mooring Details: from 2013-06-21 19:32:00 to 2017-10-24 14:30:00
Time Event: 2013-06-21 19:32:00, Redeployed by R/V Connecticut Time Event: 2013-07-10 00:00:00, Last data received from N0116's data logger (both iridium and goes) Time Event: 2014-01-02 23:30:00, Buoy has broken free from its anchor and is adrift. Data from its sensors are still being processed while the buoy is drifting. Time Event: 2013-07-10 17:00:00, Communications re-established with buoy (both iridium and Goes). Time Event: 2017-10-24 14:30:00, Buoy and instruments finally recovered by R/V Atlantic Explorer (Bermuda).
Sensor Performance: From 2013-06-21 19:32:00 to 0000-00-00 00:00:00
Data_type: wind_gust and Depth: -4 m Data_type: wind_direction and Depth: -4 m Data_type: wind_speed and Depth: -4 m
Deployed on Mooring: A0128
Mooring Details: from 2012-04-16 19:28:00 to 2012-10-22 18:25:00
Time Event: 2012-04-16 19:28:00, Redeployed by R/V Delaware II Time Event: 2012-10-22 18:25:00, Recovered by R/V Connecticut.
Sensor Performance: From 2012-04-16 19:28:00 to 0000-00-00 00:00:00
Data_type: wind_direction and Depth: -4 m Data_type: wind_speed and Depth: -4 m Data_type: wind_gust and Depth: -4 m
Deployed on Mooring: A0126
Mooring Details: from 2011-06-01 18:35:00 to 2011-10-08 11:05:00
Time Event: 2011-06-01 14:32:00, Redeployed by R/V Connecticut. Time Event: 2011-10-08 11:05:00, Recovered by R/V Connecticut
Sensor Performance: From 2011-06-01 14:32:00 to 0000-00-00 00:00:00
Data_type: wind_gust and Depth: -4 m Data_type: wind_speed and Depth: -4 m Data_type: wind_direction and Depth: -4 m
Deployed on Mooring: B0119
Mooring Details: from 2009-09-24 00:25:00 to 2010-06-04 01:15:00
Time Event: 2009-09-24 00:25:00, redeployed by R/V Argo Maine Time Event: 2010-06-04 01:15:00, recovered by R.V Argo Maine
Sensor Performance: From 2009-09-24 00:25:00 to 0000-00-00 00:00:00
Data_type: wind_speed and Depth: -4 m Data_type: wind_direction and Depth: -4 m Data_type: wind_gust and Depth: -4 m
Deployed on Mooring: I0121
Mooring Details: from 2009-01-11 00:18:00 to 2009-03-22 11:20:00
Time Event: 2009-01-11 00:18:00, Redeployed by R/V Argo Maine. Time Event: 2009-03-22 11:20:00, Recovered by R/V Delaware II
Sensor Performance: From 2009-01-11 00:18:00 to 0000-00-00 00:00:00
Data_type: wind_speed and Depth: -4 m Data_type: wind_direction and Depth: -4 m Data_type: wind_gust and Depth: -4 m
Deployed on Mooring: D0201
Mooring Details: from 2006-12-14 20:10:00 to 2008-05-01 14:35:00
Time Event: 2006-12-14 20:10:00, Deployed by R/V Argo Maine Time Event: 2007-01-29 00:00:00, Battery dropping - icing problems? Time Event: 2007-02-01 18:00:00, Set buoy to call in once per day instead of hourly due to dropping battery voltage. Time Event: 2007-02-09 15:00:00, Battery has dropped too lower to power data logger. No coms with the buoy at this time. Time Event: 2007-02-20 16:00:00, Bowdoin personnel cleared solar panels of heavy icing. Time Event: 2007-02-23 19:30:00, Buoy has started daily phone calls once again. Once battery is sufficiently recharged, hourly calls will resume. Time Event: 2007-03-24 15:00:00, Battery has recharged and buoy has resumed normal communications and sampling. Time Event: 2008-05-01 14:35:00, Recovered by R/V Ira C.
Sensor Performance: From 2006-12-14 20:10:00 to 0000-00-00 00:00:00
Data_type: wind_direction and Depth: -2 m Data_type: wind_speed and Depth: -2 m Data_type: wind_gust and Depth: -2 m
Deployed on Mooring: MS302
Mooring Details: from 2004-06-25 16:30:00 to 2005-01-08 18:00:00
Time Event: 2004-06-25 03:30:00, Deployed by R/V Argo Maine Time Event: 2005-01-08 18:00:00, Recovered by R/V Argo Maine
Sensor Performance: From 2004-06-25 02:38:00 to 2005-01-08 18:00:00
Data_type: wind_speed_sc and Depth: -3 m
Time:2004-08-04 20:00:00, Status: 0
Comments: Wrong datalogger program loaded into E0112 control box; no optics, IM, or doppler data recorded until problem was fixed.
Time:2004-07-12 00:30:00, Status: 1
Comments: Wind values all went to 0
Data_type: wind_direction_uv and Depth: -3 m
Time:2004-08-04 20:00:00, Status: 0
Comments: Wrong datalogger program loaded into E0112 control box; no optics, IM, or doppler data recorded until problem was fixed.
Time:2004-07-12 00:30:00, Status: 1
Comments: Wind values all went to 0
Deployed on Mooring: MS301
Mooring Details: from 2004-03-20 20:30:00 to 2004-06-25 03:30:00
Time Event: 2004-03-20 20:30:00, Deployed from R/V Argo Maine Time Event: 2004-06-25 00:25:00, Recovered by R/V Argo Maine
Sensor Performance: From 2004-03-20 19:52:00 to 2004-06-24 23:00:00
Data_type: wind_direction_uv and Depth: -3 m Data_type: wind_speed_sc and Depth: -3 m
Deployed on Mooring: BH303
Mooring Details: from 2002-05-23 11:00:00 to 2003-01-16 12:20:00
Time Event: 2002-05-23 00:00:00, Deployed, R/V ARGO MAINE Time Event: 2003-01-16 12:20:00, Recovered, R/V ARGO MAINE
Sensor Performance: From 2002-05-23 11:00:00 to 2003-01-16 12:20:00
Data_type: wind_direction_uv and Depth: -3 m Data_type: wind_speed_sc and Depth: -3 m
Deployed on Mooring: BH302
Mooring Details: from 2001-09-20 10:50:00 to 2002-05-22 00:00:00
Sensor Performance: From 2001-09-20 10:50:00 to 2002-05-22 00:00:00
Data_type: wind_direction_uv and Depth: -3 m Data_type: wind_speed_sc and Depth: -3 m
Deployed on Mooring: K0101
Mooring Details: from 2001-07-26 09:55:00 to 2002-03-14 15:56:00
Time Event: 2001-07-27 05:10:00, Not calling home, we have to call it Time Event: 2002-03-14 11:00:00, Recovered, R/V Argo Maine.
Sensor Performance: From 2001-07-26 09:55:00 to 2002-03-14 11:00:00
Data_type: wind_speed and Depth: -4 m Data_type: wind_direction and Depth: -4 m Data_type: wind_gust and Depth: -4 m
Deployed on Mooring: F0101
Mooring Details: from to
Time Event: 2000-07-10 19:30:00, Deployed Time Event: 2001-04-22 07:00:00, West Pen Bay has stopped transmitting. Buoy is still on station (from Coast Guard 5/04/01) Time Event: 2001-07-07 23:00:00, Mooring F0101 recovered, R/V Connecticut
Sensor Performance: From 2000-07-10 19:30:00 to 2001-07-07 17:00:00
Data_type: wind_direction and Depth: -4 m Data_type: wind_speed and Depth: -4 m
Non-Deployment Sensor Events:
Time Event: 2012-03-27 00:00:00, Event: Pre-Deployment
Comments: Passed Checkout - Ready to Deploy on Buoy A
Time Event: 2012-03-27 00:00:00, Event: Post-Recvry: PASS
Comments: Passed Checkout - Ready to Deploy on Buoy A
Time Event: 2010-06-18 00:00:00, Event: Post-Recvry: PASS
Comments: PASS
Time Event: 2009-05-22 16:00:00, Event: Prepped
Comments:
Time Event: 2009-05-22 00:00:00, Event: Pre-Deployment
Comments: Prepped for deployment.
Time Event: 2009-04-10 00:00:00, Event: Post-Recvry: PASS
Comments: All looks OK, minimal signs of wear.
Time Event: 2003-09-16 00:00:00, Event: Refurbished
Comments: New prop brgs, Applied grease to all bearings and pot outer casing.
Time Event: 2003-07-15 00:00:00, Event: Refurbished
Comments: Post repair alignment and checkout completed by Rob Bell. Instrument ready for service.
Time Event: 2003-07-14 00:00:00, Event: Post-Recovery
Comments: Both sets of Bearings replaced, new cable prior to calibration
Time Event: 2003-07-02 00:00:00, Event: Refurbished
Comments: Ground down serial number on wire guide to eliminate confusion. The number was 50003, recovered from BHB Buoy.
Time Event: 2003-07-01 00:00:00, Event: Refurbished
Comments: Replaced Cable with cable from Met 50003 which was lost