Mooring Details: from 2022-10-18 20:53:00 to 2024-05-04 21:32:00
Time Event: 2022-10-18 20:53:00, Deployed by M/V Warren Time Event: 2022-12-10 00:00:00, battery appears to be failing, likely to be offline soon. Time Event: 2022-12-18 12:00:00, battery failure Time Event: 2023-02-09 19:30:00, battery replaced, solar panel replaced, bulkhead cables repositioned, buoy back online. Time Event: 2024-05-04 21:32:00, Recovered by R/V Connecticut
Sensor Performance: From 2022-10-18 20:53:00 to 2024-05-04 21:32:00
Data_type: wind_2_gust and Depth: -4 m Data_type: wind_2_direction and Depth: -4 m Data_type: wind_2_speed and Depth: -4 m
Deployed on Mooring: E0142
Mooring Details: from 2022-10-16 21:06:00 to 2024-05-03 17:15:00
Time Event: 2022-10-16 21:06:00, Deployed by M/V Warren Time Event: 2024-05-03 17:15:00, Recovered by R/V Connecticut
Sensor Performance: From 2022-10-16 21:06:00 to 2024-05-03 17:15:00
Data_type: wind_2_speed and Depth: -4 m Data_type: wind_2_direction and Depth: -4 m Data_type: wind_2_gust and Depth: -4 m
Deployed on Mooring: B0136
Mooring Details: from 2021-11-03 15:46:00 to 2022-09-08 19:35:00
Time Event: 2021-11-03 15:46:00, deployed by M/V Warren Time Event: 2022-09-08 19:35:00,
Sensor Performance: From 2021-11-03 15:46:00 to 2022-09-08 19:35:00
Data_type: wind_2_gust and Depth: -4 m Data_type: wind_2_direction and Depth: -4 m Data_type: wind_2_speed and Depth: -4 m
Deployed on Mooring: E0140
Mooring Details: from 2020-09-16 01:12:00 to 2021-06-15 12:15:00
Time Event: 2020-09-16 01:12:00, deployed by the R/V Connecticut Time Event: 2020-09-28 07:26:00, GOES messages became very intermittent/corrupted. appears to be antenna/antenna cable problem.. Time Event: 2021-06-15 12:15:00, recovered by R/V Connecticut
Sensor Performance: From 2020-09-16 01:12:00 to 2021-06-15 12:15:00
Data_type: wind_2_speed and Depth: -4 m Data_type: wind_2_direction and Depth: -4 m Data_type: wind_2_gust and Depth: -4 m
Deployed on Mooring: A0137
Mooring Details: from 2017-06-28 00:50:00 to 2017-12-07 16:42:00
Time Event: 2017-06-28 00:50:00, deployed by the Warren Time Event: 2017-12-07 16:42:00, recovered by the R/V Connecticut
Sensor Performance: From 2017-06-28 00:50:00 to 0000-00-00 00:00:00
Data_type: wind_2_gust and Depth: -4 m Data_type: wind_2_direction and Depth: -4 m Data_type: wind_2_speed and Depth: -4 m
Deployed on Mooring: A0136
Mooring Details: from 2016-07-07 20:20:00 to 2017-06-27 16:11:00
Time Event: 2016-07-07 20:20:00, deployed by the R/V Connecticut Time Event: 2016-12-10 00:00:00, Backup GOES buffers became corrupt despite valid checksums. Time Event: 2016-12-12 00:00:00, Primary cellphone tranmssions stopped from the buoy. Attempts to contact the phone were unsuccessful although phone was visible on the AT&T network. Time Event: 2016-12-15 21:06:00, Normal communications resumed from this buoy (both cell and Goes). Time Event: 2016-07-07 21:00:00, Wave direction and tilt invalid from microstrain directional wave sensor. Time Event: 2016-10-01 00:00:00, Intermittent spiking seen on primary wind sensor (Gill), generally observed at speeds > 25 kts. Time Event: 2017-06-22 18:30:00, New program loaded into control box remotely; valid accelerometer wave data being received now from this buoy. Time Event: 2017-06-27 16:11:00, recovered by the vessel Warren
Sensor Performance: From 2016-07-07 20:20:00 to 0000-00-00 00:00:00
Data_type: wind_2_speed and Depth: -4 m Data_type: wind_2_direction and Depth: -4 m Data_type: wind_2_gust and Depth: -4 m
Deployed on Mooring: A0134
Mooring Details: from 2015-06-04 11:05:00 to 2015-10-26 17:15:00
Time Event: 2015-06-04 11:05:00, Redeployed by R/V Connecticut. Time Event: 2015-10-26 17:15:00, Receovered by the R/V Connecticut
Sensor Performance: From 2015-06-04 11:05:00 to 0000-00-00 00:00:00
Data_type: wind_2_gust and Depth: -4 m Data_type: wind_2_direction and Depth: -4 m Data_type: wind_2_speed and Depth: -4 m
Deployed on Mooring: A0132
Mooring Details: from 2014-06-04 00:41:00 to 2014-10-25 18:35:00
Time Event: 2014-06-04 00:41:00, deployed by R/V Connecticut Time Event: 2014-10-25 18:35:00, Recovered by R/V Connecticut. 20m SBE37IM conductivity guard ripped off; 50m SBE16+ damaged (pump and O2 sensor dangling).
Sensor Performance: From 2014-06-04 00:41:00 to 0000-00-00 00:00:00
Data_type: wind_2_gust and Depth: -4 m Data_type: wind_2_direction and Depth: -4 m Data_type: wind_2_speed and Depth: -4 m
Deployed on Mooring: A0130
Mooring Details: from 2013-06-20 03:55:00 to 2013-10-29 16:16:00
Time Event: 2013-06-20 03:55:00, deployed by the R/V Connecticut Time Event: 2013-10-29 16:16:00, Recovered by R/V Connecticut.
Sensor Performance: From 2013-06-20 03:55:00 to 0000-00-00 00:00:00
Data_type: wind_2_gust and Depth: -4 m Data_type: wind_2_direction and Depth: -4 m Data_type: wind_2_speed and Depth: -4 m
Deployed on Mooring: A0128
Mooring Details: from 2012-04-16 19:28:00 to 2012-10-22 18:25:00
Time Event: 2012-04-16 19:28:00, Redeployed by R/V Delaware II Time Event: 2012-10-22 18:25:00, Recovered by R/V Connecticut.
Sensor Performance: From 2012-04-16 19:28:00 to 0000-00-00 00:00:00
Data_type: wind_2_speed and Depth: -4 m Data_type: wind_2_direction and Depth: -4 m Data_type: wind_2_gust and Depth: -4 m
Deployed on Mooring: B0122
Mooring Details: from 2011-10-07 22:45:00 to 2012-04-15 10:10:00
Time Event: 2011-10-07 22:45:00, Redeployed by R/V Connecticut Time Event: 2012-02-22 17:05:00, Data logger program apparently became corrupted during a manual connection at 2012-02-22 17:05 and went into low-power mode (phone powered on only at 1800z, 1900z, 2000z). Time Event: 2012-02-23 18:15:00, A connection was made to the data logger and program was reinitialized. Normal data collection has resumed. Time Event: 2012-04-15 10:10:00, Recvoered by R/V Delaware II
Sensor Performance: From 2011-10-07 22:45:00 to 0000-00-00 00:00:00
Data_type: wind_2_gust and Depth: -4 m Data_type: wind_2_direction and Depth: -4 m Data_type: wind_2_speed and Depth: -4 m
Deployed on Mooring: A0126
Mooring Details: from 2011-06-01 18:35:00 to 2011-10-08 11:05:00
Time Event: 2011-06-01 14:32:00, Redeployed by R/V Connecticut. Time Event: 2011-10-08 11:05:00, Recovered by R/V Connecticut
Sensor Performance: From 2011-06-01 14:32:00 to 0000-00-00 00:00:00
Data_type: wind_2_speed and Depth: -4 m Data_type: wind_2_direction and Depth: -4 m Data_type: wind_2_gust and Depth: -4 m
Deployed on Mooring: A0124
Mooring Details: from 2010-06-03 20:25:00 to 2010-10-13 19:35:00
Time Event: 2010-06-03 20:25:00, redeployed by R.V. Argo Maine Time Event: 2010-10-13 20:35:00, Recovered by R/V COnnecticut.
Sensor Performance: From 2010-06-03 20:25:00 to 2010-10-13 19:35:00
Data_type: wind_2_gust and Depth: -4 m Data_type: wind_2_direction and Depth: -4 m Data_type: wind_2_speed and Depth: -4 m
Deployed on Mooring: N0110
Mooring Details: from 2009-03-27 15:15:00 to 2009-09-21 11:40:00
Time Event: 2009-03-27 15:15:00, deployed by the R/V Delaware II Time Event: 2009-09-21 11:40:00, Recovered by R/V Argo Maine.
Sensor Performance: From 2009-03-27 15:15:00 to 0000-00-00 00:00:00
Data_type: wind_2_speed and Depth: -4 m Data_type: wind_2_direction and Depth: -4 m Data_type: wind_2_gust and Depth: -4 m
Deployed on Mooring: J0214
Mooring Details: from 2006-11-29 18:40:00 to 2007-12-06 18:35:00
Time Event: 2006-11-29 18:40:00, deployed by commercial barge Time Event: 2006-11-29 19:00:00, Cellphone data transfers are intermittent. Goes transfers also showing periods of missing transmissions. Time Event: 2007-02-02 20:00:00, Buoy only calls in once per day due to drop in battery voltage below 11.5volts (solar panels iced over?). Time Event: 2007-12-06 18:50:00, recovered by commercial barge
Sensor Performance: From 2007-02-28 19:45:00 to 0000-00-00 00:00:00
Data_type: wind_gust and Depth: -4 m Data_type: wind_direction and Depth: -4 m Data_type: wind_speed and Depth: -4 m
Non-Deployment Sensor Events:
Time Event: 2012-02-16 22:00:00, Event: Prepped
Comments: Passed Checkout - Ready to Deploy on Buoy A
Time Event: 2010-02-15 22:00:00, Event: Prepped
Comments: Passed Checkout - Ready to Deploy
Time Event: 2009-11-02 12:00:00, Event: Prepped
Comments: Test and Checked for deployment - Set to Gill Polar Continuous
Time Event: 2009-03-05 14:00:00, Event: Prepped
Comments: Checked for deployment - Set to Gill Polar Continuous
Time Event: 2008-07-14 00:00:00, Event: Checked_In
Comments: Passed - Ready To Deploy
Time Event: 2008-01-29 00:00:00, Event: Programmed