Mooring Details: from 2020-10-06 02:45:00 to 0000-00-00 00:00:00
Time Event: 2020-10-06 02:45:00, deployed by the R/V Connecticut Time Event: 2020-12-15 12:00:00, battery voltage has been falling since Nov, daily lows s/b below 11.5 volts in Jan. Not charging to 14.5V like other buoys.
Sensor Performance: From 2020-10-06 02:45:00 to 0000-00-00 00:00:00
Data_type: dissolved_oxygen and Depth: 51 m
Deployed on Mooring: A0141
Mooring Details: from 2019-06-01 01:21:00 to 2019-11-26 13:40:00
Time Event: 2019-06-01 01:21:00, deployed by the R/V Connecticut Time Event: 2019-07-14 01:10:00, Last cellphone connection received from buoy. Backup GOES transmissions continue to work although certain variables missing from backup data stream (50m O2). Time Event: 2019-11-26 13:40:00, Recovered by R/V Connecticut. The locking rings on the SBE43 DO sensor and pump were loose; otherwise all looked okay.
Sensor Performance: From 2019-06-01 01:21:00 to 2019-11-26 13:40:00
Data_type: dissolved_oxygen and Depth: 51 m
Deployed on Mooring: A0138
Mooring Details: from 2017-12-08 01:54:00 to 2018-07-10 14:05:00
Time Event: 2017-12-08 01:54:00, deployed by R/V Connecticut Time Event: 2018-07-10 14:05:00, recovered by R/V Connecticut
Sensor Performance: From 2017-12-08 01:54:00 to 2018-07-10 14:05:00
Data_type: dissolved_oxygen and Depth: 51 m
Deployed on Mooring: A0136
Mooring Details: from 2016-07-07 20:20:00 to 2017-06-27 16:11:00
Time Event: 2016-07-07 20:20:00, deployed by the R/V Connecticut Time Event: 2016-12-10 00:00:00, Backup GOES buffers became corrupt despite valid checksums. Time Event: 2016-12-12 00:00:00, Primary cellphone tranmssions stopped from the buoy. Attempts to contact the phone were unsuccessful although phone was visible on the AT&T network. Time Event: 2016-12-15 21:06:00, Normal communications resumed from this buoy (both cell and Goes). Time Event: 2016-07-07 21:00:00, Wave direction and tilt invalid from microstrain directional wave sensor. Time Event: 2016-10-01 00:00:00, Intermittent spiking seen on primary wind sensor (Gill), generally observed at speeds > 25 kts. Time Event: 2017-06-22 18:30:00, New program loaded into control box remotely; valid accelerometer wave data being received now from this buoy. Time Event: 2017-06-27 16:11:00, recovered by the vessel Warren
Sensor Performance: From 2016-07-07 20:20:00 to 0000-00-00 00:00:00
Data_type: dissolved_oxygen and Depth: 51 m
Deployed on Mooring: E0401
Mooring Details: from 2012-08-14 16:42:00 to 2013-01-08 18:05:00
Time Event: 2012-08-14 16:42:00, Deployed by R/V Ira C Time Event: 2013-01-08 18:05:00, Recovered by R/V Ira C
Sensor Performance: From 2012-08-14 16:42:00 to 0000-00-00 00:00:00
Data_type: dissolved_oxygen and Depth: 14 m
Deployed on Mooring: D0104
Mooring Details: from 2007-12-14 18:46:00 to 2008-05-16 18:40:00
Time Event: 2007-12-14 16:40:00, Redeployed by R/V Ira C. Time Event: 2008-05-16 18:40:00, Recovered by R/V Ira C.
Sensor Performance: From 2007-12-14 16:40:00 to 0000-00-00 00:00:00
Data_type: dissolved_oxygen and Depth: 20.5 m
Deployed on Mooring: D0103
Mooring Details: from 2007-11-30 17:25:00 to 2007-12-14 16:30:00
Time Event: 2007-11-30 17:25:00, Redeployed by R/V Ira C. Time Event: 2007-12-14 16:30:00, Recovered by R/V Ira C.
Sensor Performance: From 2007-11-30 17:25:00 to 0000-00-00 00:00:00
Data_type: dissolved_oxygen and Depth: 20.5 m
Deployed on Mooring: D0102
Mooring Details: from 2006-11-01 18:40:00 to 2007-11-02 14:30:00
Time Event: 2006-11-01 18:40:00, Redeployed by R/V Ira C. Time Event: 2007-11-02 14:30:00, Recoverd by R/V Ira C.
Sensor Performance: From 2006-11-01 16:45:00 to 2007-11-02 14:15:00
Data_type: dissolved_oxygen and Depth: 20.3 m
Non-Deployment Sensor Events:
Time Event: 2014-08-11 12:00:00, Event: Programmed
Comments: Set for a Salinity of 0, Interval 2s, Output -2.
Time Event: 2013-10-11 00:00:00, Event: Checked_In
Comments: Check out OK. Data OK.
Time Event: 2013-04-15 12:00:00, Event: Prepped
Comments: Linekin Bay, 7m. Set for: Salinity 0, & 0s sample interval.