![]() |
GoMOOS Buoy History Physical Oceanography Group School of Marine Sciences University of Maine |
Mooring | Date | Buffer | Data Type | Depth | Comments |
---|---|---|---|---|---|
E0127 | 2011-06-04 13:55 | ALL | ALL | Redeployed by R/V Connecticut. | |
E0127 | 2012-01-14 02:00 | sbe37 | temperature | 20 | Last valid temperature data received from 20m SBEIM (conductivity ok?) |
E0127 | 2012-01-31 20:00 | doppler | ALL | 2.5 | Last data received from doppler current profiler (battery failure). |
E0127 | 2012-02-04 02:45 | doppler | All | 4 | External battery added to restore doppler data. |
E0127 | 2012-02-22 17:05 | ALL | ALL | 0 | Last data received from both cellphone and backup Goes transmitter. The cause of failure is being investigated. |
E0127 | 2012-03-12 17:30 | ALL | ALL | Box recovered - damage to box, power plug disconnected. Lid bolts loose. |
NERACOOS Home | Latest Buoy Data | U.Maine Buoys | U.Maine CODAR | GOM Weather | GOM Wave Modeling | Related Links | Software | Mooring Group | PhOG home |