Mooring Events: M0126

2016-10-08 14:50:00 ALL 999 ALL Redeployed by R/V PISCES
2016-10-08 15:00:00 ALL 256 sbe16 SBE16+ with transmissometer failed during deployment (no response from talk-through)
2016-10-08 15:00:00 ALL 20 sbe37 200m SBE37IM during deployment (no response from talk-through)
2016-10-08 15:00:00 gps_2_lat, gps_2_lon 0 diagnostics No backup Goes GPS positions being received; primary GPS working along with trackpack.
2016-10-21 12:00:00 ALL 0 ALL Problems seen with datalogger including corrupt Goes buffers (datalogger issues w/Goes xmitter coms), corrupt visibility and pressure (Goes interference), int. doppler.
2016-10-23 16:00:00 ALL 20 sbe37 Data from all inductive modem instruments started to become extremely intermittent (includes SBE37IMs and SBE44/SUNAs)
2016-10-28 22:00:00 ALL 20 sbe37 Last data received from any IM instrument (includes SBE37IMs and SBE44/SUNAs)
2016-10-28 23:00:00 ALL 2 aanderaa Last data received from surface current meter.
2017-02-09 21:30:00 wind_speed,wind_gust,wind_direction -4 met Backup RMYoung wind measurements flagged as invalid (speeds too low)
2017-02-13 21:30:00 ALL 0 ALL Buoy broke free from its anchor during storm, drifting to the south.
2017-02-21 14:30:00 ALL 999 ALL Recovered by John and Ian off the Scarlet Isabella, 8 days after breaking free. Tethers cut.


Download | Sensor Information | Software | NERACOOS Gulf of Maine Moorings | NERACOOS Home