Mooring Events: M0125

2015-11-05 23:05:00 ALL 999 ALL Redeployed (turnaround) by the R/V Connecticut
2015-11-06 00:00:00 ALL -3 goes Goes transmissions are weak for this deployment (issue with new transmitters signal strengths)
2015-11-07 12:45:00 ALL 250 suna SUNA readings are invalid (values like 19.25 changed to 128)
2016-02-19 00:00:00 ALL 250 sbe37 Data from 250m SBE37IMP becoming intermittent
2016-08-08 12:00:00 ALL 100 sbe37 Last data received from 100m SBE37IM. No response from the instrument via talkthrough.
2016-08-08 12:00:00 ALL 150 sbe37 Last data received from 150m SBE37IM. Received several response to DS command on talkthrough but then the istrument stopped sending any responses (DS showed it was still logging, clock 1 min fast)
2016-09-07 12:00:00 ALL 50 sbe37 Last data received from 50m SBE37IM. No response from the instrument via talkthrough.
2016-09-19 19:00:00 ALL 20 sbe37 Last data received from 20m SBE37IM.
2016-10-08 11:50:00 ALL 999 ALL Recovered by R/V PISCES


Download | Sensor Information | Software | NERACOOS Gulf of Maine Moorings | NERACOOS Home