Mooring Events: F0132

2019-06-04 18:18:00 ALL 999 ALL deployed by the R/V Connecticut
2019-06-10 21:00:00 ALL 999 ALL battery voltage high (>16.5V during deployment). Probably solar panel plugged directly into battery port
2019-06-10 22:00:00 ALL 20 sbe37 Last data received from 20m SBE37 IM.
2019-11-01 03:30:00 ALL 1 sbe37 Last data received from 1m SBE37 SM.
2020-01-24 13:57:45 ALL 2 aanderaa last data from instrument, stopped reporting, clock was drifiting slowly, cause unknown.
2020-05-16 00:00:00 visibility -3 met visibility response has decreased, very small response when very low (verified) visibility present (flagged 2020-06-29) rjf
2020-11-10 12:50:00 ALL 999 ALL Recovered by R/V Connecticut
2021-04-03 16:00:00 ALL 50 sbe37 Post-recovery processing completed for 50m SBE37IMP 14730. Low conductivity spikes persistent in last 4-5 months of deployment?
2021-04-10 15:00:00 ALL 20 sbe37 Post-recovery processing completed from 20m SBEIM2568 - data in file ends one week after deployment (rest of samples in memory contain data from older deployments)...
2021-04-10 15:00:00 ALL 1 sbe37 Post-recovery processing show no data in instrument from the deployment time period (only has data from previous deployments). Not correct S/N???


Download | Sensor Information | Software | NERACOOS Gulf of Maine Moorings | NERACOOS Home