Mooring Events: F0122

2011-01-05 02:25:00 ALL 999 ALL redeployed by R/V Argo Maine
2011-01-05 02:25:00 ALL 999 ALL redeployed by R/V Argo Maine
2011-01-21 18:00:00 visibility -3 met sensor reads continuoulsy low after storm and cold snap
2011-06-20 01:00:00 ALL -3 goes Last GOES transmission received (problem with GOES GPS). Cellphone working okay.
2011-06-23 06:04:00 ALL -4 doppler Doppler reset; data offset by 8 minutes (starts min 04 instead of min 56).
2011-09-19 08:00:00 ALL 4 doppler Last data received from doppler current meter (major battery failure).
2011-12-15 00:00:00 ALL 2 aanderaa Aanderaa data questionable and has been flagged as invalid (speeds too low?).
2011-12-15 03:00:00 ALL 0 goes Goes transmissions becoming intermittent (GPS problem?).
2011-12-25 21:00:00 ALL 0 goes Backup goes transmissions have essentially stopped from this buoy. Cellphone working okay.
2012-02-03 20:00:00 gps_lat,gps_lon -4 diagnostics Last valid GPS position received from this mooring.
2012-02-03 20:30:00 ALL 20 sbe37 Last data received from 20m SBE37IM. Inductive cable coupler apparently damaged during vist to rebattery RDI doppler but the instrument should still be recording data internally.
2012-02-03 21:15:00 ALL -4 doppler External battery and new cable has restored doppler data. Data from bins below 75m are very spotty and somewhat erratic (bins 1-17 okay, 18-23 have been flagged as invalid).
2012-03-06 17:30:00 ALL 0 ALL Cell phone communications failed for data logger. Cause is under investigation, but we hope to have data restored from this buoy before 20 March 2012.
2012-03-12 21:05:00 ALL 999 ALL Old control box UMECB121 removed.


Download | Sensor Information | Software | NERACOOS Gulf of Maine Moorings | NERACOOS Home