Mooring Events: A0125

2010-10-13 22:42:00 ALL 999 ALL Redeployed by R/V Connecticut
2011-01-23 15:00:00 ALL 51 optode Last valid data received from 51m oxygen sensor (attempts to talk through are garbled and inconsistent)
2011-06-01 14:45:00 ALL 999 ALL Recovered by R/V Connecticut. The cable between the inductive coupler and the serial bridge/optode was found damaged; otherwise all instruments recovered intact.


Download | Sensor Information | Software | NERACOOS Gulf of Maine Moorings | NERACOOS Home