Mooring Details: from 2017-12-08 01:54:00 to 2018-07-10 14:05:00
Time Event: 2017-12-08 01:54:00, deployed by R/V Connecticut Time Event: 2018-07-10 14:05:00, recovered by R/V Connecticut
Sensor Performance: From 2017-12-08 01:54:00 to 2018-07-10 14:05:00
Data_type: conductivity and Depth: 50 m Data_type: temperature and Depth: 50 m
Deployed on Mooring: A0136
Mooring Details: from 2016-07-07 20:20:00 to 2017-06-27 16:11:00
Time Event: 2016-07-07 20:20:00, deployed by the R/V Connecticut Time Event: 2016-12-10 00:00:00, Backup GOES buffers became corrupt despite valid checksums. Time Event: 2016-12-12 00:00:00, Primary cellphone tranmssions stopped from the buoy. Attempts to contact the phone were unsuccessful although phone was visible on the AT&T network. Time Event: 2016-12-15 21:06:00, Normal communications resumed from this buoy (both cell and Goes). Time Event: 2016-07-07 21:00:00, Wave direction and tilt invalid from microstrain directional wave sensor. Time Event: 2016-10-01 00:00:00, Intermittent spiking seen on primary wind sensor (Gill), generally observed at speeds > 25 kts. Time Event: 2017-06-22 18:30:00, New program loaded into control box remotely; valid accelerometer wave data being received now from this buoy. Time Event: 2017-06-27 16:11:00, recovered by the vessel Warren
Sensor Performance: From 2016-07-07 20:20:00 to 0000-00-00 00:00:00
Data_type: conductivity and Depth: 50 m Data_type: temperature and Depth: 50 m
Deployed on Mooring: A0134
Mooring Details: from 2015-06-04 11:05:00 to 2015-10-26 17:15:00
Time Event: 2015-06-04 11:05:00, Redeployed by R/V Connecticut. Time Event: 2015-10-26 17:15:00, Receovered by the R/V Connecticut
Sensor Performance: From 2015-06-04 11:05:00 to 0000-00-00 00:00:00
Data_type: conductivity and Depth: 50 m Data_type: temperature and Depth: 50 m
Deployed on Mooring: A0132
Mooring Details: from 2014-06-04 00:41:00 to 2014-10-25 18:35:00
Time Event: 2014-06-04 00:41:00, deployed by R/V Connecticut Time Event: 2014-10-25 18:35:00, Recovered by R/V Connecticut. 20m SBE37IM conductivity guard ripped off; 50m SBE16+ damaged (pump and O2 sensor dangling).
Sensor Performance: From 2014-06-04 00:41:00 to 0000-00-00 00:00:00
Data_type: temperature and Depth: 50 m Data_type: conductivity and Depth: 50 m
Deployed on Mooring: C0213
Mooring Details: from 2006-12-15 00:10:00 to 2007-03-24 11:10:00
Time Event: 2006-12-15 00:10:00, Redeployed by R/V Argo Maine. Time Event: 2007-01-03 01:00:00, Cellphone having trouble connecting during late night hours. Time Event: 2007-03-24 11:10:00, Recovered by R/V Delaware II.
Sensor Performance: From 2006-12-15 00:10:00 to 2007-03-24 11:10:00
Data_type: conductivity and Depth: 20 m Data_type: temperature and Depth: 20 m
Deployed on Mooring: C0212
Mooring Details: from 2006-09-13 08:40:00 to 2006-12-14 22:30:00