Mooring Details: from 2022-10-18 20:53:00 to 2024-05-04 21:32:00
Time Event: 2022-10-18 20:53:00, Deployed by M/V Warren Time Event: 2022-12-10 00:00:00, battery appears to be failing, likely to be offline soon. Time Event: 2022-12-18 12:00:00, battery failure Time Event: 2023-02-09 19:30:00, battery replaced, solar panel replaced, bulkhead cables repositioned, buoy back online. Time Event: 2024-05-04 21:32:00, Recovered by R/V Connecticut
Sensor Performance: From 2022-10-18 20:53:00 to 2024-05-04 21:32:00
Data_type: conductivity and Depth: 50 m Data_type: temperature and Depth: 50 m
Deployed on Mooring: B0135
Mooring Details: from 2021-06-16 11:50:00 to 2021-11-03 11:25:00
Time Event: 2021-06-16 11:50:00, deployed by R/V Connecticut after instrument swap Time Event: 2021-11-03 11:25:00, recovered by M/V Warren
Sensor Performance: From 2021-06-16 11:50:00 to 2021-11-03 11:25:00
Data_type: conductivity and Depth: 50 m Data_type: temperature and Depth: 50 m
Deployed on Mooring: B0134
Mooring Details: from 2020-09-15 02:21:00 to 2021-06-16 10:45:00
Time Event: 2020-09-15 02:21:00, deployed by the R/V Connecticut Time Event: 2021-06-16 11:00:00, recovered by R/V Connecticut prior to instrument swap
Sensor Performance: From 2020-09-15 02:21:00 to 2021-06-16 11:00:00
Data_type: conductivity and Depth: 50 m Data_type: temperature and Depth: 50 m
Deployed on Mooring: E0503
Mooring Details: from 2019-07-24 15:25:00 to 2019-12-17 15:50:00
Time Event: 2019-07-24 15:25:00, deployed by the R/V Ira C. Time Event: 2019-12-17 15:50:00, Recovered by R/V IRA C. 5M IM apparently slid down to 10m at some point during deployment.
Sensor Performance: From 2019-07-24 15:25:00 to 2019-12-17 15:50:00
Data_type: conductivity and Depth: 15 m Data_type: temperature and Depth: 15 m
Deployed on Mooring: F0131
Mooring Details: from 2018-09-30 18:40:00 to 2019-06-04 11:46:00
Time Event: 2018-09-30 18:40:00, deployed by R/V Connecticut Time Event: 2019-06-04 11:46:00, recovered by the R/V Connecticut
Sensor Performance: From 2018-09-30 18:40:00 to 2019-06-04 11:46:00
Data_type: conductivity and Depth: 50 m Data_type: temperature and Depth: 50 m
Deployed on Mooring: N0120
Mooring Details: from 2016-07-24 20:05:00 to 2017-07-27 16:30:00
Time Event: 2016-07-24 16:05:00, Redeployed by R/V Connecticut. Time Event: 2017-02-13 22:00:00, Buoy moved 500m to NW during a storm (peak winds 24 m/s, waves 7m, surface currents 1.4 m/s). Time Event: 2017-03-01 00:00:00, Problems connecting to the buoy using iridium have continued for several periods this winter (may be related to cold temps?). Normal communications have typically been restored after 1-5 days. Time Event: 2017-07-15 05:00:00, Buoy is no longer anchored and is presently adrift. Time Event: 2017-07-27 16:30:00, Buoy and instruments recovered by M/V Megan T Miller. Time Event: 2017-07-27 20:00:00, Acoustic release and float recovered from anchor site by M/V Megan T Miller.
Sensor Performance: From 2016-07-24 16:05:00 to 0000-00-00 00:00:00
Data_type: conductivity and Depth: 180 m Data_type: temperature and Depth: 180 m
Non-Deployment Sensor Events:
Time Event: 2022-03-19 00:00:00, Event: In_from_Repair
Comments: Cleaned and replatinized the conductivity cell. Performed a "Final" Calibration. Installed NEW AF24173 Anti-foulant cylinder(s).
Time Event: 2022-03-19 00:00:00, Event: In_from_Repair
Comments: Performed initial diagnostic evaluation. Performed pressure calibration. Performed "POST" cruise calibration. Replaced the O-rings. Performed a hydrostatic pressure test.
Time Event: 2022-03-19 00:00:00, Event: In_from_Repair