Mooring Events: F0125

2013-06-23 01:04:00 ALL 999 ALL Redeployed by R/V Connecticut
2013-10-08 11:00:00 ALL 20 sbe37 Last data received from20m IM (ICC/cable problems?)
2013-10-08 11:00:00 ALL 50 sbe37 Last data received from20m IM (ICC/cable problems?)
2013-10-28 14:30:00 ALL 0 ALL Last data received from buoy F0125 (both cellphone and GOES).
2013-11-04 21:20:00 ALL 0 ALL New program loaded into datalogger; normal operations have resumed (20m and 50m IMs also reporting).
2014-01-24 23:00:00 gps_lat, gps_lon 0 diagnostics Last valid BAE GPS data received; backup GPS is sending valid positions.
2014-01-26 19:00:00 gps_lat, gps_lon 0 diagnostics Valid data being received again from primary GPS.
2014-02-19 18:40:00 barometric_pressure -3 met Last valid data received from Setra barometric pressure sensor.
2014-02-23 17:30:00 barometric_pressure -3 met Barometric pressure sensor sending valid data once again.
2014-06-01 11:10:00 ALL 999 ALL Recovered by R/V Connectictut. Heavily fouled with traps and pot warp; chain looped/knotted about 25' above anchor.