Mooring Details: from 2018-07-08 16:15:00 to 2019-09-21 14:00:00
Time Event: 2018-07-08 16:15:00, deployed (slack mooring) by R/V Connecticut Time Event: 2018-12-11 22:00:00, Buoy broke free from its anchor - presently adrift. Time Event: 2019-09-21 14:00:00, Recovered by Portugese Naval vessel off Ponta Delgado (Azores). Wire rope had been parted below 50m IM (bottom 3 IMs were lost).
Sensor Performance: From 2018-07-08 16:15:00 to 2019-09-21 14:00:00
Data_type: barometric_pressure and Depth: -3 m
Time:2018-08-19 19:50:00, Status: 1
Comments: Barometric pressure sensor reading near zero volts for long periods of time (over 24 hours) before returning to valid readings.
Deployed on Mooring: N0120
Mooring Details: from 2016-07-24 20:05:00 to 2017-07-27 16:30:00
Time Event: 2016-07-24 16:05:00, Redeployed by R/V Connecticut. Time Event: 2017-02-13 22:00:00, Buoy moved 500m to NW during a storm (peak winds 24 m/s, waves 7m, surface currents 1.4 m/s). Time Event: 2017-03-01 00:00:00, Problems connecting to the buoy using iridium have continued for several periods this winter (may be related to cold temps?). Normal communications have typically been restored after 1-5 days. Time Event: 2017-07-15 05:00:00, Buoy is no longer anchored and is presently adrift. Time Event: 2017-07-27 16:30:00, Buoy and instruments recovered by M/V Megan T Miller. Time Event: 2017-07-27 20:00:00, Acoustic release and float recovered from anchor site by M/V Megan T Miller.
Sensor Performance: From 2016-07-24 16:05:00 to 0000-00-00 00:00:00
Data_type: barometric_pressure and Depth: -3 m
Deployed on Mooring: MDS02
Mooring Details: from 2009-11-05 16:50:00 to 2010-10-12 22:50:00
Time Event: 2009-11-05 16:50:00, Redeployed by R/V Connecticut Time Event: 2010-08-24 10:00:00, Buoy moved about 400m to SW during past 20 hours during storm. Time Event: 2010-10-12 22:50:00, Recovered by R/V Connecticut.
Sensor Performance: From 2009-11-05 16:50:00 to 0000-00-00 00:00:00
Data_type: barometric_pressure and Depth: -3 m
Deployed on Mooring: B0118
Mooring Details: from 2009-03-21 16:33:00 to 2009-09-23 21:20:00
Time Event: 2009-03-21 16:33:00, Redeployed by R/V Delaware II. Time Event: 2009-09-23 21:20:00, Recovered by R/V Argo Maine (lost anchor and most of chain due to heavy fouling with gear)/
Sensor Performance: From 2009-03-21 16:33:00 to 0000-00-00 00:00:00
Data_type: barometric_pressure and Depth: -3 m
Deployed on Mooring: B0116
Mooring Details: from 2008-04-16 20:50:00 to 2008-10-02 11:15:00
Time Event: 2008-04-16 14:50:00, Deployed from Delaware II Time Event: 2008-10-02 11:15:00, Recovered by R/V Argo Maine.
Sensor Performance: From 2008-04-16 14:50:00 to 0000-00-00 00:00:00
Data_type: barometric_pressure and Depth: -3 m
Deployed on Mooring: B0114
Mooring Details: from 2007-03-24 01:15:00 to 2007-09-23 19:20:00
Time Event: 2007-03-24 01:15:00, Mooring B0114 Redeployed By R/V Delaware II Time Event: 2007-09-23 19:20:00, Recovered by R/V Argo Maine.
Sensor Performance: From 2007-03-24 01:15:00 to 0000-00-00 00:00:00
Data_type: barometric_pressure and Depth: -3 m
Deployed on Mooring: B0111
Mooring Details: from 2006-04-10 13:35:00 to 2006-09-13 11:30:00
Time Event: 2006-04-10 13:40:00, redeployed by NOAA Ship Delaware II Time Event: 2006-09-13 11:30:00, Recovered by R/V Argo Maine. Time Event: 2006-09-13 14:34:00, Redeployed by R/V Argo Maine. Time Event: 2006-09-13 11:30:00, Recovered by R/V Argo Maine
Sensor Performance: From 2006-04-10 13:40:00 to 2006-09-13 11:30:00
Data_type: barometric_pressure and Depth: -3 m
Deployed on Mooring: B0109
Mooring Details: from 2005-04-29 03:30:00 to 2005-10-22 16:15:00
Time Event: 2005-04-29 03:30:00, Redeployed by RV Delaware II Time Event: 2005-07-31 12:00:00, Cellphone transmissions becoming intermittent. Time Event: 2005-08-04 21:00:00, Last cellphone transmission was received. Cellular company reports that the buoy's cellphone is roaming and are looking into the problem. Time Event: 2005-10-22 16:15:00, Recovered by R/V Argo Maine.
Sensor Performance: From 2005-04-29 03:30:00 to 2005-10-22 16:15:00