Mooring Details: from 2011-06-03 20:10:00 to 2011-12-05 06:30:00
Time Event: 2011-06-03 20:10:00, Redeployed by R/V Connecticut. Time Event: 2011-12-05 06:30:00, Recovered by R/V Delaware II on NOAA/NMFS fisheries cruise.
Sensor Performance: From 2011-06-03 20:10:00 to 0000-00-00 00:00:00
Data_type: barometric_pressure and Depth: -3 m
Deployed on Mooring: M0116
Mooring Details: from 2009-10-02 17:10:00 to 2010-06-09 10:10:00
Time Event: 2009-10-02 17:10:00, Redeployed by R/V Argo Maine. Time Event: 2009-12-01 12:00:00, Buoy having problems with iridium phone (calling but having trouble transfering data). Time Event: 2010-06-09 10:10:00, Recovered by R/V Argo Maine.
Sensor Performance: From 2009-10-02 17:10:00 to 0000-00-00 00:00:00
Data_type: barometric_pressure and Depth: -3 m
Deployed on Mooring: J0215
Mooring Details: from 2007-12-06 20:10:00 to 2009-05-28 13:10:00
Time Event: 2007-12-06 20:10:00, Redeployed by R/V Argo Maine. Time Event: 2008-01-01 01:00:00, Last cellphone transmission received. Time Event: 2007-12-06 20:30:00, Goes transmitter failed shortly before deployment. Time Event: 2008-01-16 05:00:00, Buoy batteries are too low; buoy in low-power mode (daily transmission, hourly met sampling) Time Event: 2008-01-21 17:00:00, Buoy has resumed normal hourly communications (batteries recharged). Time Event: 2008-01-28 01:00:00, Buoy batteries are too low; buoy in low-power mode (daily transmission, hourly met sampling) Time Event: 2008-02-16 18:00:00, Buoy has resumed normal hourly communications (batteries recharged). Time Event: 2008-01-04 14:00:00, Buoy and solar panels cleared of ice; water found inside well. Lid bolts retightened. Time Event: 2008-10-28 07:00:00, Buoy in low power mode due to low battery voltage. Transfers data once per day at 2000z if battery levels are high enough. Time Event: 2009-05-28 13:10:00, Recovered by R/V Argo Maine.
Sensor Performance: From 2007-12-06 20:10:00 to 0000-00-00 00:00:00
Data_type: barometric_pressure and Depth: -3 m
Deployed on Mooring: J0213
Mooring Details: from 2006-05-12 17:00:00 to 2006-11-29 16:30:00
Time Event: 2006-05-12 17:00:00, Redeployed by R/V Tracker Time Event: 2006-11-29 16:30:00, Recovered by Heritage Salmon vessel.
Sensor Performance: From 2006-05-12 17:00:00 to 2006-11-29 16:30:00
Data_type: barometric_pressure and Depth: -3 m
Deployed on Mooring: J0212
Mooring Details: from 2006-01-13 15:35:00 to 2006-05-12 15:45:00
Time Event: 2006-01-13 15:35:00, Redeployed with help from Cooke Salmon in Eastport. Time Event: 2006-05-11 15:00:00, Last cellphone/Goes transmission received from buoy. Believe that error during software download caused control box lockup. Repair planned for 12 May 2006... Time Event: 2006-05-12 15:45:00, Recovered by R/V Tracker.
Sensor Performance: From 2006-01-13 15:35:00 to 2006-05-12 15:45:00
Data_type: barometric_pressure and Depth: -3 m
Deployed on Mooring: J0211
Mooring Details: from 2005-09-27 17:05:00 to 2006-01-13 14:20:00
Time Event: 2005-09-27 17:35:00, redeployed by R/V Argo Maine Time Event: 2005-12-25 12:00:00, Battery voltage starting to drop on data logger. Time Event: 2006-01-13 14:20:00, Recovered with help from Cooke Salmon.
Sensor Performance: From 2005-09-27 17:35:00 to 2006-01-13 14:20:00