Mooring Details: from 2016-07-07 20:20:00 to 2017-06-27 16:11:00
Time Event: 2016-07-07 20:20:00, deployed by the R/V Connecticut Time Event: 2016-12-10 00:00:00, Backup GOES buffers became corrupt despite valid checksums. Time Event: 2016-12-12 00:00:00, Primary cellphone tranmssions stopped from the buoy. Attempts to contact the phone were unsuccessful although phone was visible on the AT&T network. Time Event: 2016-12-15 21:06:00, Normal communications resumed from this buoy (both cell and Goes). Time Event: 2016-07-07 21:00:00, Wave direction and tilt invalid from microstrain directional wave sensor. Time Event: 2016-10-01 00:00:00, Intermittent spiking seen on primary wind sensor (Gill), generally observed at speeds > 25 kts. Time Event: 2017-06-22 18:30:00, New program loaded into control box remotely; valid accelerometer wave data being received now from this buoy. Time Event: 2017-06-27 16:11:00, recovered by the vessel Warren
Sensor Performance: From 2016-07-07 20:20:00 to 0000-00-00 00:00:00