Mooring Details: from 2022-09-09 15:40:00 to 2023-09-20 16:45:00
Time Event: 2022-09-09 15:40:00, Deployed by M/V Warren Time Event: 2023-09-20 16:45:00, Recovered by M/V James Goodwin
Sensor Performance: From 2022-09-09 15:40:00 to 2023-09-20 16:45:00
Data_type: temperature and Depth: 1 m Data_type: conductivity and Depth: 1 m
Deployed on Mooring: A0143
Mooring Details: from 2020-10-06 02:45:00 to 2021-06-16 16:45:00
Time Event: 2020-10-06 02:45:00, deployed by the R/V Connecticut Time Event: 2020-12-15 12:00:00, battery voltage has been falling since Nov, daily lows s/b below 11.5 volts in Jan. Not charging to 14.5V like other buoys. Time Event: 2021-06-16 16:45:00, Recovered by R/V Connecticut
Sensor Performance: From 2020-10-06 02:45:00 to 2021-06-16 16:45:00
Data_type: temperature and Depth: 1 m
Time:2020-11-29 12:33:01, Status: 1
Comments: lastr data from ctd. Low voltage. vMain = 6.96, vLith = 3.03, "not logging, low battery"
Data_type: conductivity and Depth: 1 m
Time:2020-11-29 12:33:01, Status: 1
Comments: lastr data from ctd. Low voltage. vMain = 6.96, vLith = 3.03, "not logging, low battery"
Deployed on Mooring: ME101
Mooring Details: from 2014-04-22 17:30:00 to 2014-05-02 14:45:00
Time Event: 2014-04-22 17:30:00, Deployed by UMaine on R/V Crossrate Time Event: 2014-04-24 04:00:00, Last data received from buoy; possible cellphone or data logger problems. Time Event: 2014-05-02 14:45:00, Recovered by UMaine. Buoy in good shape. Small amount of wear on ultrex line level with base of well.
Sensor Performance: From 2014-04-22 17:30:00 to 0000-00-00 00:00:00
Data_type: temperature and Depth: 0.25 m Data_type: conductivity and Depth: 0.25 m
Non-Deployment Sensor Events:
Time Event: 2022-03-19 00:00:00, Event: In_from_Repair
Comments: Services Requested: SERVICE37 REPLACEAF
Time Event: 2022-03-19 00:00:00, Event: In_from_Repair
Comments: Problems Found: Conductivity cell found to have high drift.
Time Event: 2022-03-19 00:00:00, Event: In_from_Repair
Comments: Performed initial diagnostic evaluation. Performed "POST" cruise calibration. Cleaned and replatinized conductivity cell. Performed "FINAL" calibration.
Time Event: 2022-03-19 00:00:00, Event: In_from_Repair
Comments: Replaced the O-rings. Performed a hydrostatic pressure test. Installed NEW AF24173 Anti-foulant cylinder(s).
Time Event: 2022-01-19 12:00:00, Event: Out_for_Repair
Comments:
Time Event: 2020-09-02 12:00:00, Event: Prepared
Comments: Ready for deployment
Time Event: 2020-02-12 00:00:00, Event: Out_for_Repair
Comments:
Time Event: 2014-03-05 18:13:00, Event: Prepared
Comments: Ready for deployment
Time Event: 0000-00-00 00:00:00, Event: Post-Recovery