Mooring Details: from 2016-07-08 13:15:00 to 2017-12-08 13:30:00
Time Event: 2016-07-08 13:15:00, Redeployed by R/V Connecticut Time Event: 2017-12-08 13:30:00, Recovered by R/V Connecticut. Heavily fouled with mussels; fishing gear entangled with wire. Gill sonic anemometer was damaged during recovery operations.
Sensor Performance: From 2016-07-08 13:15:00 to 0000-00-00 00:00:00
Data_type: temperature and Depth: 52 m Data_type: conductivity and Depth: 52 m