Mooring Details: from 2021-11-04 18:38:00 to 2023-09-16 10:15:00
Time Event: 2021-11-04 18:38:00, deployed by M/V Warren Time Event: 2023-09-16 10:15:00, buoy missing after passage of Hurricane Lee, not recovered
Sensor Performance: From 2021-11-04 18:38:00 to 2023-09-16 10:15:00
Data_type: temperature and Depth: 200 m Data_type: conductivity and Depth: 200 m
Deployed on Mooring: N0116
Mooring Details: from 2013-06-21 19:32:00 to 2017-10-24 14:30:00
Time Event: 2013-06-21 19:32:00, Redeployed by R/V Connecticut Time Event: 2013-07-10 00:00:00, Last data received from N0116's data logger (both iridium and goes) Time Event: 2014-01-02 23:30:00, Buoy has broken free from its anchor and is adrift. Data from its sensors are still being processed while the buoy is drifting. Time Event: 2013-07-10 17:00:00, Communications re-established with buoy (both iridium and Goes). Time Event: 2017-10-24 14:30:00, Buoy and instruments finally recovered by R/V Atlantic Explorer (Bermuda).
Sensor Performance: From 2013-06-21 19:32:00 to 0000-00-00 00:00:00
Data_type: temperature and Depth: 100 m Data_type: conductivity and Depth: 100 m
Non-Deployment Sensor Events:
Time Event: 2021-01-05 12:00:00, Event: Out_for_Repair
Comments:
Time Event: 2020-02-12 00:00:00, Event: Out_for_Repair