Mooring Details: from 2015-11-04 01:55:00 to 2016-07-25 00:50:00
Time Event: 2015-11-04 01:55:00, Redeployed (turnaround) by R/V Connecticut Time Event: 2016-04-09 00:00:00, Buoy moved about 350m to NW during period of strong incoming currents. Time Event: 2016-05-08 20:00:00, Last data received from buoy due to problems with control box. Time Event: 2016-05-10 16:30:00, Control box program remotely recompiled and data flow has been restored (both iridium and Goes). No met, diagnostics or mstrain data available during the period with program issues (8/9 May). Time Event: 2016-07-10 21:30:00, Surface buoy has broken free from its anchor and is presently adrift (bottom instrument at 180m is still reporting). Time Event: 2016-07-25 00:50:00, Subsurface float/release and surface buoy/instruments/wire/tethers were recovered by R/V Connecticut. Shackle between bottom of tethers and float was missing; no signs of damage.
Sensor Performance: From 2015-11-04 01:55:00 to 0000-00-00 00:00:00
Data_type: wind_direction and Depth: -4 m Data_type: wind_gust and Depth: -4 m