Mooring Details: from 2018-07-08 16:15:00 to 2019-09-21 14:00:00
Time Event: 2018-07-08 16:15:00, deployed (slack mooring) by R/V Connecticut Time Event: 2018-12-11 22:00:00, Buoy broke free from its anchor - presently adrift. Time Event: 2019-09-21 14:00:00, Recovered by Portugese Naval vessel off Ponta Delgado (Azores). Wire rope had been parted below 50m IM (bottom 3 IMs were lost).
Sensor Performance: From 2018-07-08 16:15:00 to 2019-09-21 14:00:00
Data_type: wind_2_speed and Depth: -4 m Data_type: wind_2_direction and Depth: -4 m Data_type: wind_2_gust and Depth: -4 m