Mooring Details: from 2018-07-08 16:15:00 to 2019-09-21 14:00:00
Time Event: 2018-07-08 16:15:00, deployed (slack mooring) by R/V Connecticut Time Event: 2018-12-11 22:00:00, Buoy broke free from its anchor - presently adrift. Time Event: 2019-09-21 14:00:00, Recovered by Portugese Naval vessel off Ponta Delgado (Azores). Wire rope had been parted below 50m IM (bottom 3 IMs were lost).
Sensor Performance: From 2018-07-08 16:15:00 to 2019-09-21 14:00:00
Data_type: air_temperature and Depth: -3 m
Deployed on Mooring: N0120
Mooring Details: from 2016-07-24 20:05:00 to 2017-07-27 16:30:00
Time Event: 2016-07-24 16:05:00, Redeployed by R/V Connecticut. Time Event: 2017-02-13 22:00:00, Buoy moved 500m to NW during a storm (peak winds 24 m/s, waves 7m, surface currents 1.4 m/s). Time Event: 2017-03-01 00:00:00, Problems connecting to the buoy using iridium have continued for several periods this winter (may be related to cold temps?). Normal communications have typically been restored after 1-5 days. Time Event: 2017-07-15 05:00:00, Buoy is no longer anchored and is presently adrift. Time Event: 2017-07-27 16:30:00, Buoy and instruments recovered by M/V Megan T Miller. Time Event: 2017-07-27 20:00:00, Acoustic release and float recovered from anchor site by M/V Megan T Miller.
Sensor Performance: From 2016-07-24 16:05:00 to 0000-00-00 00:00:00
Data_type: air_temperature and Depth: -3 m
Deployed on Mooring: E0202
Mooring Details: from 2010-08-11 14:30:00 to 2011-01-06 17:30:00
Time Event: 2010-08-11 14:30:00, New control box, waves sensors installed by F/V Priscilla Earl. Time Event: 2010-11-08 05:00:00, Buoy batteries are too low; buoy in low-power mode (daily transmissions, hourly met samples) Time Event: 2010-11-18 10:50:00, Battery has recharged and buoy has resumed normal communications/sampling. Time Event: 2011-01-06 17:30:00, Recovered by R/V Argo Maine.
Sensor Performance: From 2010-08-11 14:30:00 to 0000-00-00 00:00:00
Data_type: air_temperature and Depth: -3 m
Deployed on Mooring: E0201
Mooring Details: from 2010-06-22 17:59:00 to 2010-08-11 13:10:00
Time Event: 2010-06-22 17:59:00, Deployed by R/V Argo Maine. Time Event: 2010-08-11 13:10:00, Control box swap. New buoy will be E0202.
Sensor Performance: From 2010-06-22 17:59:00 to 0000-00-00 00:00:00
Data_type: air_temperature and Depth: -3 m
Deployed on Mooring: MDS01
Mooring Details: from 2009-10-09 12:28:00 to 2009-11-05 15:20:00
Time Event: 2009-10-09 12:28:00, Deployed by R/V Connecticut Time Event: 2009-11-05 15:20:00, Recovered by R/V Connecticut
Sensor Performance: From 2009-10-09 12:28:00 to 0000-00-00 00:00:00