Mooring Details: from 2008-09-25 18:15:00 to 2009-03-21 22:50:00
Time Event: 2008-09-25 18:15:00, Redeployed by R/V Argo Maine. Time Event: 2009-03-21 22:50:00, Recovered by R/V Delaware II
Sensor Performance: From 2008-09-25 18:15:00 to 0000-00-00 00:00:00
Data_type: air_temperature and Depth: -3 m
Deployed on Mooring: E0121
Mooring Details: from 2007-09-18 11:45:00 to 2008-04-20 08:00:00
Time Event: 2007-09-18 11:45:00, Redeployed by R/V Argo Maine. Time Event: 2007-12-31 05:00:00, Last cellphone and goes transmission received from the buoy. Time Event: 2008-01-03 14:20:00, Communications with data logger reestablished and updated data are available once again. Time Event: 2008-01-10 16:00:00, Data logger reset; cellphone and Goes transmissions restored (had locked up at 1100z 2008/01/10). Time Event: 2008-01-14 21:00:00, Last cellphone/Goes transmission received from buoy (control box lockup). Time Event: 2008-01-15 14:25:00, Communications with data logger reestablished and updated data are available once again. Time Event: 2008-01-16 03:00:00, Last cellphone/Goes transmission received from buoy (control box lockup). Time Event: 2008-01-16 12:15:00, Communications with data logger reestablished and updated data are available once again. Time Event: 2008-04-20 08:00:00, Recovered on Delaware II
Sensor Performance: From 2007-09-18 11:45:00 to 0000-00-00 00:00:00
Data_type: air_temperature and Depth: -3 m
Deployed on Mooring: E0119
Mooring Details: from 2006-12-05 19:10:00 to 2007-05-09 17:15:00
Time Event: 2006-12-05 19:10:00, deployed by the R/V Argo Maine Time Event: 2007-05-09 15:15:00, Recovered by R/V Argo Maine (lost 50m sbe37im, chain, anchor).
Sensor Performance: From 2006-12-05 19:10:00 to 2007-05-09 17:15:00
Data_type: air_temperature and Depth: -3 m
Deployed on Mooring: E0118
Mooring Details: from 2006-09-12 13:20:00 to 2006-12-05 17:10:00
Time Event: 2006-09-12 13:20:00, Redeployed by R/V Argo Maine. Time Event: 2006-12-05 17:10:00, Recovered by R/V Argo Maine
Sensor Performance: From 2006-09-12 13:20:00 to 2006-12-05 17:10:00
Data_type: air_temperature and Depth: -3 m
Deployed on Mooring: E0116
Mooring Details: from 2005-10-11 19:50:00 to 2006-04-12 14:20:00
Time Event: 2005-10-11 19:50:00, Redeployed by R/V Argo Maine. Time Event: 2006-04-12 11:15:00, recovered by NOAA Ship Delaware II
Sensor Performance: From 2005-10-11 19:50:00 to 2006-04-12 11:15:00
Data_type: air_temperature and Depth: -3 m
Deployed on Mooring: E0114
Mooring Details: from 2005-02-25 06:05:00 to 2005-05-31 19:55:00
Time Event: 2005-02-25 06:05:00, redeployed by R/V Argo Maine Time Event: 2005-05-31 19:55:00, Recovered by R/V Argo Maine.
Sensor Performance: From 2005-02-25 06:05:00 to 2005-05-31 19:55:00
Data_type: air_temperature and Depth: -3 m
Deployed on Mooring: E0113
Mooring Details: from 2005-01-05 00:10:00 to 2005-02-25 01:45:00
Time Event: 2005-01-05 00:10:00, Mooring redeployed by R/V Argo Maine Time Event: 2005-02-25 02:20:00, recovered by R/V Argo Maine
Sensor Performance: From 2005-01-05 00:10:00 to 2005-02-25 02:20:00
Data_type: air_temperature and Depth: -3 m
Time:2005-01-17 01:00:00, Status: 1
Comments: Last data received from tower optics.
Deployed on Mooring: E0112
Mooring Details: from 2004-11-19 17:20:00 to 2005-01-04 15:55:00
Time Event: 2004-11-19 17:20:00, Mooring redeployed by R/V Argo Maine. Time Event: 2004-12-12 11:34:00, Wrong datalogger program loaded into E0112 control box; no optics, IM, or doppler data recorded until problem was fixed. Time Event: 2004-12-14 15:34:00, Correct datalogger program reloaded into E0112 control box; 2 days of wave data lost, 2 days of Doppler, IM, and optics data missing until instrument downloads are completed. Time Event: 2005-01-04 15:55:00, Mooring recovered by R/V Argo Maine to replace cabling/instruments.
Sensor Performance: From 2004-11-19 17:20:00 to 2005-01-04 15:55:00
Data_type: air_temperature and Depth: -3 m
Time:2004-12-02 12:00:00, Status: 1
Comments: Data from tower PAR sensor went to zero.
Deployed on Mooring: E0111
Mooring Details: from 2004-10-06 19:10:00 to 2004-11-19 11:45:00
Time Event: 2004-10-06 19:10:00, Mooring redeployed by R/V Argo Maine. Time Event: 2004-11-19 11:15:00, Mooring recovered by R/V Argo Maine.
Sensor Performance: From 2004-10-06 19:10:00 to 2004-11-19 11:15:00
Data_type: air_temperature and Depth: -3 m
Deployed on Mooring: E0109
Mooring Details: from 2004-01-28 08:20:00 to 2004-04-27 19:50:00
Time Event: 2004-01-28 08:15:00, Redeployed by R/V Argo Maine. Time Event: 2004-04-27 19:50:00, Recovered by R/V Argo Maine.
Sensor Performance: From 2004-01-28 08:15:00 to 2004-04-27 19:50:00
Data_type: air_temperature and Depth: -3 m
Deployed on Mooring: E0108
Mooring Details: from 2004-01-10 21:45:00 to 2004-01-27 15:15:00
Time Event: 2004-01-10 21:45:00, Swapped wind, visibility, control box. Time Event: 2004-01-10 22:00:00, Cellphone problems after repair. No Goes transmissions. Time Event: 2004-01-27 16:00:00, Recovered, R/V Argo Maine.
Sensor Performance: From 2004-01-10 21:45:00 to 2004-01-27 16:00:00
Data_type: air_temperature and Depth: -3 m
Deployed on Mooring: E0107
Mooring Details: from 2003-10-09 18:05:00 to 2004-01-10 18:15:00
Time Event: 2003-10-09 18:05:00, Redeployed by R/V Connecticut Time Event: 2003-10-17 19:00:00, Last goes buffer received from buoy. Cell phone working fine. Time Event: 2004-01-10 18:00:00, Recovered by R/V Argo Maine.
Sensor Performance: From 2003-10-09 18:05:00 to 2004-01-10 18:00:00
Data_type: air_temperature and Depth: -3 m
Deployed on Mooring: E0103
Mooring Details: from 2002-04-19 02:23:00 to 2002-07-25 13:55:00
Time Event: 2002-04-19 03:00:00, Mooring at site E redeployed Time Event: 2002-07-25 14:00:00, Recovered by R/V Argo Maine. Time Event: 2003-01-17 00:00:00, Cell phone becoming intermittent in periods of cold/windy weather
Sensor Performance: From 2002-04-19 03:00:00 to 2002-07-25 14:00:00
Data_type: air_temperature and Depth: -3 m
Deployed on Mooring: E0101
Mooring Details: from 2001-07-09 12:15:00 to 2001-09-20 09:30:00
Time Event: 2001-07-09 12:00:00, Deployed. Time Event: 2001-09-21 12:00:00, Buoy is adrift. Time Event: 2001-09-21 22:00:00, Surface buoy recovered by R/V ARGO. Time Event: 2001-10-27 12:00:00, Bottom portion of mooring was successfully recovered by dragging operations.
Sensor Performance: From 2001-07-09 12:00:00 to 2001-09-21 12:00:00