Mooring Details: from 2005-05-20 12:30:00 to 2005-09-27 11:30:00
Time Event: 2005-05-12 15:00:00, Redeployed by R/V Argo Maine. Time Event: 2005-09-27 11:30:00, Recovered by R/V Argo Maine.
Sensor Performance: From 2005-05-12 15:00:00 to 2005-09-27 11:30:00
Data_type: gps_lat and Depth: -4 m Data_type: gps_lon and Depth: -4 m
Deployed on Mooring: I0103
Mooring Details: from 2002-07-24 19:54:00 to 2003-01-15 19:50:00
Time Event: 2002-07-24 20:10:00, Deployed by R/V ARGO MAINE. Time Event: 2003-01-15 19:50:00, Recovered by R/V Argo Maine. Wind nose cone missing, 3 solar panels lost.
Sensor Performance: From 2002-07-24 20:10:00 to 2003-01-15 19:00:00
Data_type: gps_lat and Depth: -4 m Data_type: gps_lon and Depth: -4 m
Deployed on Mooring: E0101
Mooring Details: from 2001-07-09 12:15:00 to 2001-09-20 09:30:00
Time Event: 2001-07-09 12:00:00, Deployed. Time Event: 2001-09-21 12:00:00, Buoy is adrift. Time Event: 2001-09-21 22:00:00, Surface buoy recovered by R/V ARGO. Time Event: 2001-10-27 12:00:00, Bottom portion of mooring was successfully recovered by dragging operations.
Sensor Performance: From 2001-07-09 12:00:00 to 2001-09-21 12:00:00
Data_type: gps_lon and Depth: -4 m Data_type: gps_lat and Depth: -4 m
Non-Deployment Sensor Events:
Time Event: 2017-01-10 00:00:00, Event: Prepped
Comments:
Time Event: 2007-10-24 00:00:00, Event: Refurbished
Comments: replaced connector - use 2 gaskets w/conxal connector