Mooring Details: from 2015-06-06 16:45:00 to 2016-07-08 21:05:00
Time Event: 2015-06-06 16:45:00, Redeployed by R/V Connecticut. Time Event: 2016-07-08 21:05:00, recovered by R/V Connecticut Time Event: 2016-07-09 00:00:00, Wire rope parted during recovery just below 20m IM; 50m IM, 51m SUNA, 87m SBE16+/trans and fish counter recovered 4 hrs later after successful grappling (some damage to brackets/mounts/inst).
Sensor Performance: From 2015-06-06 16:45:00 to 0000-00-00 00:00:00
Data_type: visibility and Depth: -3 m
Deployed on Mooring: I0128
Mooring Details: from 2013-06-24 01:20:00 to 2014-05-31 20:00:00
Time Event: 2013-06-24 01:20:00, redeployed by R/V Connecticut Time Event: 2014-05-31 21:15:00, Recovered by R/V Connecticut without problems or damage.
Sensor Performance: From 2013-06-24 01:20:00 to 0000-00-00 00:00:00