Mooring Details: from 2011-10-08 14:50:00 to 2012-04-16 12:38:00
Time Event: 2011-10-08 14:50:00, Redeployed by R/V Connecticut Time Event: 2012-04-16 12:38:00, Recovered by R/V Delaware II.
Sensor Performance: From 2011-10-08 14:50:00 to 2012-02-05 13:30:00
Data_type: visibility and Depth: -3 m
Time:2012-01-22 01:00:00, Status: 1
Comments: Visibility sensor failed (reads too low).
Time:2012-02-05 13:30:00, Status: 0
Comments: Replaced visibility sensor.
Deployed on Mooring: A0125
Mooring Details: from 2010-10-13 22:42:00 to 2011-06-01 14:45:00
Time Event: 2010-10-13 22:42:00, Redeployed by R/V Connecticut Time Event: 2011-06-01 14:45:00, Recovered by R/V Connecticut. The cable between the inductive coupler and the serial bridge/optode was found damaged; otherwise all instruments recovered intact.
Sensor Performance: From 2010-10-13 22:42:00 to 0000-00-00 00:00:00