Mooring Details: from 2019-06-01 01:21:00 to 2019-11-26 13:40:00
Time Event: 2019-06-01 01:21:00, deployed by the R/V Connecticut Time Event: 2019-07-14 01:10:00, Last cellphone connection received from buoy. Backup GOES transmissions continue to work although certain variables missing from backup data stream (50m O2). Time Event: 2019-11-26 13:40:00, Recovered by R/V Connecticut. The locking rings on the SBE43 DO sensor and pump were loose; otherwise all looked okay.
Sensor Performance: From 2019-06-01 01:21:00 to 2019-11-26 13:40:00
Data_type: temperature and Depth: 2 m Data_type: current_u and Depth: 2 m Data_type: current_v and Depth: 2 m